Conveyance Status Non-BRAC Excess
Environmental Cost To Complete (CTC)
The Non-BRAC Excess Installations’ CTC of approximately $407M represents costs for environmental response actions and includes the costs on previously-conveyed properties for long-term management of ongoing environmental cleanup remedies such as groundwater monitoring. Over the last 20 years, the Army achieved Response Complete (RC) status at many of these properties but is now working expensive and complex remediation actions such as military munitions responses and large groundwater plume cleanups. These actions require both significant upfront investments and continued funding to achieve compliance. The longer the cleanup at these complex sites is deferred, the greater will be the final cost of cleanup due to inflation. In addition to cleanup of the remaining property, the CTC includes costs for long-term monitoring on already-conveyed properties.
Information current as of 19 Mar 2026
| Installation | CTC ($M) |
| Badger AAP | 84.3 |
| Charles Melvin Price Support Center | 6.6 |
| Indiana AAP | 6.7 |
| Joliet AAP | 52.5 |
| Longhorn AAP | 118.0 |
| Milan AAP | TBD |
| Ravenna AAP¹ | Note 1 |
| Rocky Mountain Arsenal² | Note 2 |
| Sharp AD | 163.4 |
| St Louis AAP | 0 |
| Stanley R. Mickelsen | 0 |
| Sunflower AAP | 59.6 |
| Tarheel Missile Plant | 0 |
| Twin Cities AAP | 74.4 |
| Volunteer AAP | 14.4 |
| Total | 579.9 |
¹ Property and environmental cleanup responsibilities transferred to the Ohio Army National Guard. CTC will no longer be tracked by the BRAC program.
² Property and environmental cleanup responsibilities transferred to IMCOM. CTC will no longer be tracked by the BRAC program.